For systems larger than 7 kWp, you should be able to waive the 70% rule via Smart Meter, right? A new/different/additional meter or what exactly is that and how much does it cost? Since I’m running just under 10 kWp.
Yep, Smart Meter is then mandatory. Maybe already installed at your place? In some cases it is already mandatory. This means a new meter or an additional device.
The goal is that the electricity meter/the additional device performs data transmission.
Installation costs, if you voluntarily want a suitable meter, are at the operator’s discretion. Otherwise, there are annual caps for meter rental fees.
I myself don’t have one yet either, although I should (electricity consumption over 10,000 kWh + heat pump). But I have to get to it sometime, because quite a bit of electricity is cut off in summer (10 kWp system).