kati1337
2022-03-19 13:55:12
- #1
Near Bad Tölz, so southern Bavaria. They also lack the KfW subsidy in their budget. It was already tight and calculated optimistically before, now they have pulled the ripcord. Allegedly, however, they get out of the matter without major costs.
A construction company we are talking to said they expect the KfW new-build subsidy to return after Easter. But only KfW40, probably not the 55 anymore.