Construction costs are currently skyrocketing

  • Erstellt am 2021-04-23 10:46:58

hauskauf1987

2022-09-15 14:36:13
  • #1


I have meanwhile received information on what will be done specifically and have taken your points into account:

Me: Questions about photovoltaic provision and wall box provision:
What specific services are covered by the additional costs?
For the preparation of the photovoltaic system, 2x empty conduits M32 should be laid over the roof covering and sealed, ideally with photovoltaic cable already pulled through. Do you cover this?

Answer (short and sweet :)): Yes

Me: Similarly for the wall box. Outdoor Schuko socket with empty conduit and pulled-in cable. Secured in the distribution box with its own RCD. Is all this covered by the additional costs or "even more"? Could you please specify a bit more concretely?

Answer: Cable routing and connection in the distribution box. Junction box for later expansion of a wall box.

So ok or should I pay attention to something else? 1,500 euros net costs for both preparations together. Sounds pretty expensive compared to Scout* 300 euros :(
 

TmMike_2

2022-09-15 14:38:21
  • #2

What do you mean expensive, just use a wall chase cutter and anchor bolts and do the work yourself?!
 

MayrCh

2022-09-15 15:56:23
  • #3
As you can possibly tell from the name, he is a buyer, not a builder. So no DIY work.
 

WilderSueden

2022-09-16 13:40:37
  • #4
Invoice from the quarry has arrived. Gravel 0/32 unwashed including delivery in a three-axle truck €15.40/t net The quarry is about 15km away. I'm not quite sure yet why exactly this quarry was chosen for delivery. Another one is only 10km away and also easy to drive to by truck
 

HausiKlausi

2022-09-17 00:40:08
  • #5
When it comes to fracking, CO2 or fine dust is the smallest problem. The relentless poisoning caused by the sludge cannot realistically be calculated. This is a real offense against our environment. Quote from Quarks: "More than 1100 chemicals can be used in shale gas fracking. Some of the substances used are classified as carcinogenic, some can alter genetic material or impair fertility – for example, if groundwater or drinking water were contaminated with these chemicals."
 

Stephan—

2022-09-17 22:48:38
  • #6
Almost fell off the chair today, paid "leicht" 44€ gross for ready-made filler at the building supplier and was sent on a roundabout way to the trade dealer Raaaaa & K (because they did not have it in stock themselves) and see the price 29€ (gross) I couldn't quite get over the fact that as a private person you have to pay so much more.
 

Similar topics
04.11.2009Taking a loan for equity financing?19
28.03.2011Can we afford to build a house without equity?14
20.07.2011House construction: Equity / incidental construction costs realistic?14
30.04.2012No equity, good income, financing feasible?22
26.08.2012Small single-family house, little equity but good income, is it at all feasible?11
14.11.2012KfW loan as equity capital - Who knows this financing?10
19.03.2013General questions about equity and construction costs10
01.05.2013No equity / existing consumer loans / financing possible?11
20.06.2013Problems with equity - real estate purchase15
27.02.2015Financing plan: high equity / 2.67% / 15 years / full repayment15
14.01.2014Different share/equity for construction. How to write it firmly?10
16.01.2014Problems with bank - equity10
20.02.2014Equity - Reserve for Unexpected44
17.06.2014House purchase planned at the beginning of 2015 - No equity41
02.08.2014Does the bank require our own equity when taking out a loan?11
21.08.2014Is financing without equity realistic?19
04.09.2014How to use equity14
05.10.2014Building a house without equity26
27.10.2014Fixed interest rate financing without equity?20
16.01.2015Is financing possible with my own equity?19

Oben