hauskauf1987
2022-09-15 14:36:13
- #1
We had an outdoor Schuko socket installed, fed with 5x2.5 mm2. In the box, it is three-phase protected with its own RCD. Initially, only one phase of the Schuko was used, it all cost around 150 euros. In the meantime, we were able to perfectly connect a wall box with 11 kW to it (22 kW would require a thicker cross-section).
For photovoltaics: The electrician was commissioned to install an empty conduit, M32, which he laid with some overhang from the HAR to under the roof covering. We also hired the roofer to install the empty conduit through the roof covering in a second step and seal it at the top with a sealed coupling. Total also around 150 euros.
If you later need more than one string (one per roof side or roughly every 50 m2), take a thicker empty conduit or even two. And make sure the electrician does not make the bending radius too tight.
I have meanwhile received information on what will be done specifically and have taken your points into account:
Me: Questions about photovoltaic provision and wall box provision:
What specific services are covered by the additional costs?
For the preparation of the photovoltaic system, 2x empty conduits M32 should be laid over the roof covering and sealed, ideally with photovoltaic cable already pulled through. Do you cover this?
Answer (short and sweet :)): Yes
Me: Similarly for the wall box. Outdoor Schuko socket with empty conduit and pulled-in cable. Secured in the distribution box with its own RCD. Is all this covered by the additional costs or "even more"? Could you please specify a bit more concretely?
Answer: Cable routing and connection in the distribution box. Junction box for later expansion of a wall box.
So ok or should I pay attention to something else? 1,500 euros net costs for both preparations together. Sounds pretty expensive compared to Scout* 300 euros :(