So, for example, I built a surface collector myself. Before building the house. 1 week of work, material + excavator 2.4k (35% of that covered by the Federal Financial Supervisory Authority) Brine pump, controlled residential ventilation with enthalpy heat recovery, heating, sanitary facilities cost me in the end 28,500€ (with not little subsidies). For 3 shower bathrooms, 2.5 kitchens (1x utility room kitchenette with sink, heat pump dryer, etc.) and 270m2 living space. Built in 20/21 Just to get a relation about what we are talking about here. PS Offer for brine drilling 99m was 7,800€, which matches some others here - but if granite comes at 70m, there might be a problem. With us, shells etc. appear from 80m. Presumably from the last Ice Age
 

kaninchenbau

2022-06-15 23:31:55
  • #2
On the topic of purchasing land: At the beginning of the year, building plots were advertised here in a municipality, and we looked at the allocation but didn’t get anything suitable. At that time, out of 103 plots, all except 18 (all LPB III, the others no LPB) were reserved.

I just checked the municipality’s website again: about 40 plots are (again) free, about 20 only reserved. That is quite shocking, if 60% of the plots have not yet been sold. That would have been unthinkable a year ago (next major city 20 km away).
 

i_b_n_a_n

2022-06-15 23:46:16
  • #3
No idea how expensive it was before, currently we have received three trucks with screened topsoil, each with 26 tons. Per truck 515 euros :oops:
 

Myrna_Loy

2022-06-16 00:00:43
  • #4
Are there still loads for the truck? My neighbor paid 15 euros per ton. I happen to know this exactly because we paid him a case of beer for two tons.
 

i_b_n_a_n

2022-06-16 00:16:19
  • #5
All inclusive, i.e. including delivery and tipping per ton 18.7 euros plus 1.1 euros energy surcharge
 

Tolentino

2022-06-16 06:53:54
  • #6
I think that is cheaper than with me.
Paid about the same amount for 15 cubic meters. Don’t know what the density factor is there.
 

Similar topics
06.06.2017Local bank markets plots - linked deal26
10.11.20202 (dream) properties - financing unclear. Save equity?40
05.08.2021Divide and develop plots themselves24
12.01.2022Union of two plots - redefine the building envelope?20
05.09.2023Application for a new development area: Selection of plots41

Oben