Just a question:
We are currently planning our electrical installation. In this process, we do not want to have the photovoltaic system and wallbox installed by the developer because it's too expensive, but only the "preparation".
Does that mean the empty conduits are laid up to the installation point? Are the pipes visible then or is some kind of cap placed in the wall/ceiling?
What should such a photovoltaic and wallbox "preparation" cost?
Well, the empty conduit comes out somewhere outside and then a cap is placed on it. Alternatively, you have to have it plastered over and later chiseled open.
How soon after moving in should the wallbox be installed? You hardly save any money with "just laying empty conduit".
My electrician charged 130 EUR for 2xM32 empty conduit from the distribution board to the attic and 160 EUR for 12m 5x10² cable to outside, plus 80 EUR for the circuit breaker (which you need anyway). You might as well have the cable pulled right away...