Construction costs are currently skyrocketing

  • Erstellt am 2021-04-23 10:46:58

Pinkiponk

2022-06-26 09:24:59
  • #1
I can understand your rejection, but I would leave it to the moderator. Of course, anyone can apply for a suspension. You are doing the right thing for yourself. Aside from that, I don't think it's about ideology, but about geostrategic and thus power interests. I just noticed that part of my above text was removed anyway, so the moderation has already taken action. Thank you. :)
 

danielohondo

2022-06-26 09:43:12
  • #2
You have understood what the conflict is about. However, I would appreciate it if no political topics were discussed here in the forum. And yes, that also includes speed limits. Please stay on topic, and the topic is construction costs. Thank you.
 

Fuchsbau35

2022-06-26 10:30:01
  • #3


Well, as a building novice, I always thought that the windows should be in place for the interior construction. Otherwise, everything is exposed to wind and weather and thieves. My boyfriend is very optimistic. He still believes that we will have our new kitchen by Christmas. Given the delay for the measurement and the delivery times stated by the kitchen studio, I am still skeptical. But with things like this, Hasi1 is usually right. We will see.
 

ypg

2022-06-26 10:51:16
  • #4

I don't know if you should inquire with the Chamber of Crafts, but I know about the 2 weeks of winter holidays which, at least according to our general contractor 9 years ago, were sacred to the craftsmen. Our tiler, the subcontractor, also did _not_ work during that time.
 

Baufuchs2000

2022-06-26 11:03:22
  • #5
To relieve some of you here, today there are again numerous display kitchens for a small amount on a large Dutch auction portal. Alno, Nobilia, Häcker, etc. You have to see if it fits, you have to dismantle, assemble, and pick up yourself. But of course, you save five-figure amounts. There are top brand kitchens for under 1000 euros.

Links are not allowed here, so please inquire via PM.
 

sergutsh

2022-06-26 11:12:51
  • #6
in our contract, 14 days each are allocated for winter and summer company holidays under construction time.
 

Similar topics
27.02.2015Burglary-proof windows?33
03.06.2014Interior design - windows14
16.01.2018Is an extra charge for colored windows realistic?19
18.06.2014Inspector defect identification, determination of window installation10
27.05.2015Huge problem with condensation on the window34
20.12.2019Trefz window prices and experiences?14
26.01.2015Window between two rooms13
13.03.2015Opinions on window parapet height sought30
09.04.2015For porthole, special regulations? Window, single-family house 1.5 stories.18
22.04.2015Window, roller shutter, exterior plaster10
28.05.2015Round window - dissatisfied with the interior reveal16
27.05.2015Which roller shutters with a closed window, only glazing?13
15.10.2015Kitchen planning with deep windows43
16.09.2019Windows in new buildings: triple glazing with a green tint?21
26.06.2015Floor plan question, stairs, window, orientation12
07.09.2015Kniestock height 2-story windows eaves side14
24.09.2015Which windows and doors are recommended?21
03.10.2016Reed contact alarm system window. How did you solve that?12
20.02.2020What does the electrician do during the shell construction phase?19
23.03.2020Building law: Electrician refuses to continue78

Oben