Wow, so economical.
In the end, we had over 8000 kWh. But it was also two houses with screed heating and delayed heat pump delivery as well as straw house connection. That means for the first house the heat pump also ran for about two weeks on construction power.
However, I believe we could have simply made a different electricity contract. The kWh price was quite good back then. At most, I could have taken advantage of switching bonuses.