Neubau2022
2022-07-30 18:02:14
- #1
I also paid 11,000 for a Huawei system including a 10 kW storage and 400 heat pump Trina vertex modules.
For the same system, 35,000 euros are being asked today, I have seen corresponding offers. Delivery time, however, if at all, sometime in 2023.
Even the commissioning often takes months. So the electrical specialist connects the system and checks it. Then he does a test run and switches the system off again. Then he reports this to the grid operator. It can take up to 6 months until the system is allowed to go online. So no electricity is produced for 6 months.
I just called the grid operator yesterday. There is now also a shortage of electricity meters. They are simply not available. What a joke. Energy transition? Maybe they also come from Russia and are sanctioned.
This is beyond ridiculous.
Just a stupid question. Our 13 kWp photovoltaic system will be finally connected on August 30+31 (registration + inverter). The price was €1,050 net per kWp. Completely black and with power optimizers. Do you still have to wait for the grid operator’s approval? I thought it starts from that moment :-(