Evaluation of Photovoltaic System Offer with Storage

  • Erstellt am 2023-09-26 13:02:13

hanse987

2023-09-30 11:15:18
  • #1

With us, everyone gets a new meter very quickly, even if they only register a balcony power plant.
 

sysrun80

2023-09-30 12:28:16
  • #2


Unfortunately, not here yet. I had waited almost a year. I think it is improving, but it cannot be denied. Our grid operator had the same problem.
 

RotorMotor

2023-09-30 12:37:16
  • #3
But these are problems of the measurement point operator and not yours. These incoherent statements from the forum troll simply lead to nothing...
 

sysrun80

2023-09-30 12:39:40
  • #4


Well, it depends. If you do not get a bidirectional meter for months and the system cannot be used because of that, it is indeed a problem.

Apart from that, you are right :cool:
 

RotorMotor

2023-09-30 13:13:04
  • #5
You can also feed in without a bidirectional meter. The grid operator is obliged to purchase photovoltaic electricity under the Renewable Energy Act. Yes, the problem can therefore be convincing the grid operator of their obligations, but that should not be the reason for failure.
 

Buchsbaum

2023-09-30 19:29:38
  • #6
Of course, you can feed in without acceptance of the system and without a bidirectional meter.

But then you are already moving in a certain criminally relevant area.

There is no acceptance from the grid operator without a new meter. And as already mentioned, there are thousands of photovoltaic investors who have been waiting for exactly this acceptance for more than 1 year.

Better buy yourself a rotary engine than give stupid advice here.
 

Similar topics
05.03.2010Passive house, heating combination with solar, energy recovery, photovoltaics?38
12.02.2015Photovoltaic systems & storage systems *collective thread*21
06.08.2015Photovoltaics for hot water26
20.11.2015Solar / Photovoltaic from an economic perspective53
23.02.2016Photovoltaic + Battery - Which System - Experiences?17
26.04.201616.03.16: Start of photovoltaic assembly60
16.07.2016KfW 40+ and 10,000 Houses Program - Requirements for Photovoltaics?13
06.04.2016Financing for 15 or 20 years? Photovoltaics via KFW?10
30.05.2016KfW55: Gas or air-water heat pump with/without photovoltaics17
30.05.2016Photovoltaics on the roof as a second layer11
21.06.2016Heat pump with photovoltaics vs gas and solar thermal52
10.07.2016Air-water heat pump with photovoltaics or pellet with solar25
13.07.2016Photovoltaic storage - experiences? Tips?17
31.10.2018Network operator refuses gas home connection - Is this legitimate?11
28.07.2020Photovoltaics and heat pump - meter confusion and cost issue12
21.01.2021Photovoltaic systems yield experiences?22
03.01.2022Electricity meter for heat pump in combination with BAFA and photovoltaic22
02.02.2022How large does the photovoltaic system need to be?36
02.06.2025Help with photovoltaic decision41