Bookstar
2018-09-11 18:03:47
- #1
The plasterer plastered up to about 20 below the top edge of the concrete stairs and left the rest open.
We did this throughout the house where tiling was done (that is, in the bathrooms, utility room, and pantry).
Then the tiling was done, and at the end it was "skimmed," followed by a final coat of plaster on top.
Of course, each time the floor coverings/stairs were carefully masked off.
All done independently.
Thank you very much for the explanation. Wow, sounds elaborate, the plasterer probably charged extra again. But it really looks great.