Over the weekend, our drywall installer really put in the effort again and built the pre-walls for the toilet, sink, and shower wall with a frame.
[ATTACH alt="IMG_20190601_154721.jpg" type="full"]34970[/ATTACH]
[ATTACH alt="IMG_20190601_154120.jpg" type="full"]34971[/ATTACH]
On Ascension Day, I already started renovating the attic so that all the odds and ends can be moved up there right away during the move.
[ATTACH alt="IMG_20190530_155231.jpg" type="full"]34973[/ATTACH]