The rough-in plumbing is finished. The roof is now complete, including the chimney cladding. Today the satellite dish will be installed along with the wiring running down to the basement. Tomorrow the plumbing pre-wall will be done. On Saturday, the rough-in electrical installation will start. Starting next week, the L-blocks around the terrace and the carport along with the curbstones for the paths around the house will be laid. I am really looking forward to that.
Everything is running smoothly so far without any special incidents or mishaps. This is what I call relaxed single-trade contracting. But I am also keeping on top of everything.
![]()
![]()
What you see here is 140 sqm of raw living space plus a waterproof in-situ concrete basement built to KfW55 standard, with a cold roof, windows, interior/exterior window sills, steel/wood staircase, rough-in plumbing, 3-sided fireplace including chimney, 36 meters of 1.30 L-blocks, 240 m³ excavation/deposit and terrain modeling.
For all the items listed, it now totals €190k. Just for orientation for those interested.