House Pictures Chat Corner - Show off your house pictures!

  • Erstellt am 2015-11-25 10:27:31

hampshire

2020-05-09 10:18:04
  • #1
The parking space where a carport will be placed is slowly coming together. First, create a border with graywacke in a flowing structure.:

By the way, stability is possible even without mortar.
 

Tarnari

2020-05-09 19:28:55
  • #2
The roof is finally on... The dormers will come once the windows are in. The mounts for the photovoltaic system are already on it as well.
 

Andre77

2020-05-13 22:26:49
  • #3
Today I did a first light test in the dark. I think it looks very successful.

 

rick2018

2020-05-14 06:23:52
  • #4
How much kWp photovoltaic do you have on it?
 

Andre77

2020-05-14 07:01:54
  • #5
9.9 kWp
 

rick2018

2020-05-14 07:16:35
  • #6
Looked like much more. Hence my question.
 

Similar topics
08.12.2014Small photovoltaic system 2 KWp11
21.02.2018Economic efficiency of a 10-kWp system vs. a 5-kWp system11
30.08.2018Operating data of a 10 kWp system. Exchange of various data15
09.05.2020Photovoltaic system: How many kWp are enough for a house?80
29.03.2020Commissioning of 9.3 kWp system combined with air-to-water heat pump and controlled residential ventilation10
30.03.20229.2 kWP system - size of the battery storage?11
30.01.20231483€ per kWp | CanadianSolar 11.48 kWp and SMA inverters47
06.01.2025Is the photovoltaic price okay? 10.2 kWp and 5 kWh storage14

Oben