AMNE3IA
2021-03-15 11:34:03
- #1
The baseboards still need to be done. But we are waiting until autumn for that :). Thanks. This is the laundry chute.[ATTACH width="183px" type="full"]58798[/ATTACH]
Similar topics | ||
09.08.2015 | Problem with connection of washbasin to drainage pipe | 16 |
15.10.2017 | Heating of the supply air in the pipe | 16 |
28.05.2019 | Condensation and mold on the supply air duct - What to do? | 11 |
28.06.2019 | Guest WC: Lower the ceiling or cover the pipe? | 16 |
06.10.2023 | Unknown pipe in the garden and concrete cover | 10 |