matte
2017-10-13 12:37:41
- #1
Because we routed the entire strand through a KG2000 pipe under the floor slab into the technical room. At that time, the installation planning of the "Technikzentrale" was not yet completed. Now the cables were made rather too long, rather than having the problem later that the cables are too short. I know, not optimal, but better safe than sorry in this case.