Stephan—

2021-05-17 18:53:33
  • #1
May I ask how you realized the roofing? We want to have it like that too and our architect recommended a solid ceiling for the garage to keep it monolithic. I almost suspect that everything was timber construction with you, since the windows are around the corner!?
 

Obermuh

2021-05-24 08:37:50
  • #2
Now everything in the atrium is finally "finished." Unfortunately, it already shows that the floorboards were not laid completely flat and there is a small wave in it... Damn. I also don't really like the individual boards at the edges (partly perpendicular to the laying pattern, not connected to the main surface), but that was the easiest solution to quickly access the drains to clean them.



This should be enough for now, but I will have to work on it again at some point.
 

Isokrates

2021-06-04 12:17:00
  • #3
Here are some current pictures of our project. Currently, work on the outdoor facilities is underway. Inside, the bathrooms will be fully plastered next week and the electrical installation completed.
 

Strahleman

2021-06-05 08:27:19
  • #4
Since last week, our front door has been installed and yesterday the Blower Door Test was conducted. During the leak detection, four or five small leaks were found that the drywall contractor still needs to fix. Despite the leaks, we achieved an n50 value of 0.7 1/h. For the final house and without leaks, the tester suspects that we will reach a maximum of 0.6 1/h. For a KFW55 house, I think that is an absolutely top value, with which I am really very satisfied.

In addition, we have carried out a few DIY tasks in the last few days. Among other things, we have installed a drywall partition wall that hides the ventilation ducts of the controlled residential ventilation and tiled the basement rooms. Unfortunately, we still have major problems with drainage. Our sanitary technician has no idea and accepts oversized offers from manufacturers, which he passes on to us without review, 1:1. The issue is currently escalating with the construction contractor...




 

benediktr

2021-06-06 12:09:51
  • #5
Yesterday, the 0.5 finishing plaster was applied on the lime base plaster. The result is visible, and the walls finally became white. We also finished wallpapering and painting the suspended light cove lighting.





 

i_b_n_a_n

2021-06-06 15:39:16
  • #6
We are also making small progress. The first layer of plaster is applied, everything should be finished in 2-3 weeks including the paint. The delays were due to the weather (too cold, too wet) and nothing happened last week because the whole crew was down thanks to the vaccination. But it's better to be down because of the vaccination than because of Corona ;). The screed on the upper floor has now been finished for a week, and the screed on the ground floor will be laid on Tuesday.
 

Similar topics
29.01.2014Cost saving/basement/affordable tiles/sealed screed?13
08.05.2014Most moisture from screed?25
10.05.2015Screed uneven - defect removal refused52
10.08.2015In which season of the year is it best to bring screed into the basement10
13.04.2017Screed with gold sand17
28.04.2016Order screed - plaster14
27.05.2016Plastic fittings/water pipes and insulating underfloor heating beneath screed?40
07.08.2016Upper floor without screed - only concrete floor15
08.06.2016Questions about underfloor heating - new subfloor/screed/granite tiles14
31.07.2016Screed does not extend into the reveals at windows / terrace doors on the ground floor12
29.07.2018Perimeter insulation under the floor slab and still XPS under the screed?28
31.10.2016Heating the screed with the utility provider?!12
29.11.2016Front door only burglary protection / better materials - plaster, screed?10
02.02.2017Is ventilation/drying after installing screed/interior plaster sensible?15
05.04.2017Super disaster - water pipe burst, screed damp31
09.04.2017Screed is too low. Are there standards for this?16
30.04.2017Screed applied too high - room height consequently lower11
05.08.2017Screed necessary? Unfinished but insulated attic23
19.08.2017Technical room before installing screed: should the technology be painted now or later?16