I have seen quite a few electrical rough installations in pictures here, so I was really surprised that I didn’t see a single empty conduit on my bare floor today. Apparently, the electrician planned so far ahead that everything is in the concrete ceilings. Indeed, only the rough plumbing installation is on the floor. Tomorrow the plasterers will come and continue preparing everything. The silo is coming on Thursday. Afterwards, there might be pictures already on Friday, also with the second L-shaped block row.