Slava_S
2019-02-20 13:28:21
- #1
Do the 190k€ refer to amounts actually paid (with or without 10% retention of security?) or from the calculation of the planned costs? I still have AZ claims outstanding from January so I couldn't precisely name the status based on amounts paid, hence the curious inquiry. Basically, really good price. Is the architect already included too?What you see here are 140 sqm shell living space plus WU in-situ concrete basement in KfW55 standard, with cold roof, windows, interior/exterior window sills, steel/wood staircase, rough-in plumbing, 3-sided fireplace including chimney, 36m 1.30 L-shaped stones, 240m³ excavation/deposit and terrain modeling.