To bring a little life back here... the last time I spoke was about the roof covering.
Pictures of the rough installation of plumbing (finished) and electrical rough installation (almost finished) are not so exciting to show.
In the meantime, we have built the wooden beam ceiling of the garage, here are two pictures.
And the windows were installed this week, here are three pictures. There are a total of twelve elements, although the window in the basement (slope) and the one in the stairwell above the garage are not visible in the photos.
The plasterer is already ready to start, by the end of next week the interior should also look completely different.
