Grantlhaua
2019-05-29 11:59:44
- #1
The shafts have now all been set. There is still a discussion with the architect / shell builder for one, because the two empty conduits running in there have a bend in their course. I am not willing to accept that as it is – structurally, there was actually nothing against laying them perfectly straight.
The formwork for the floor slab is also largely finished. The lightning protection company will come in the next few days for the remaining work, and then hopefully it can soon start with pouring the floor slab.
It feels like the formwork is a bit low for gravel, perimeter insulation, and concrete?