House Pictures Chat Corner - Show off your house pictures!

  • Erstellt am 2015-11-25 10:27:31

11ant

2018-04-27 19:04:52
  • #1
That is basically a double win: firstly a beautiful house and secondly I have to admit that I did not expect that after the first drawings.
 

Eldea

2018-04-27 19:53:34
  • #2
The glass cost a bit extra, but it wasn't worth mentioning. The insert filling would have been expensive, but it wasn't worth it to us. That would have cost over €1,000 extra [emoji15]
 

R.Hotzenplotz

2018-04-27 22:53:33
  • #3
This is how it looked yesterday on our construction site. Unfortunately, there is a delay because the structural builder received the Poroton bricks too late. Actually, the upper floor should almost be finished by now.



 

ruppsn

2018-04-28 11:42:36
  • #4


Look on the bright side. For us, it’s now 6 months delay, we have nothing except a construction pit. The shell builder has been fired, the contract was terminated. Rarely came across such a pain in the ass of a contractor. Thought it was a 7k 14k expensive lesson. Build with a craftsman whose goal is to get things done, not with companies that are maybe bigger but rather write letters (!) instead of talking to the customer
 

ruppsn

2018-04-28 11:45:09
  • #5
Very good prices. The house would have easily cost 100k-150k more here with us - according to a comparison with our LVs and similar items. Windows (+17k) are very cheap, for example heating/plumbing without fixtures (+17k), screed (factor 2), architect (+24k) as well. Or are those net prices [emoji848][emoji6]
 

Arifas

2018-04-28 14:33:09
  • #6
Ruppsn, I'm really sorry for you that things are not going smoothly at all [emoji27]! Hopefully, things will get going with full momentum very soon!

A lot has happened here again in two days. On the ground floor, the steel rods that were apparently supporting the ceiling have now been removed, there are sheets with tar on the floor that smell strongly (is that supposed to be there and yes, why??), we have the battens on the roof, on which the tiles will probably be placed on Wednesday, the gutter is attached, and the electrician has laid outdoor cables and fixed the cables in the grooves with clips. On the earth-adjacent walls, a cement-colored plaster was applied, and next week the waterproofing with foil (?) is planned
 

Similar topics
02.02.2009Building materials are stolen at the construction site12
11.10.2017Sealing on Styrodur insulation?14
22.07.2017Horizontal sealing of the base slab24
04.09.2017Sealing the garage with a concrete floor?21
21.10.2017Sealing the base slab before the roof is installed19
10.07.2018Does the structural builder have to paint the transition between styrofoam and brick wall black?12
11.10.2018Waste on the construction site - What is tolerable?138
15.10.2018Is the shell construction overloaded? Current situation in the construction industry!13
08.11.2018Structural shell / Structural shell cost calculation - How does it calculate?52
02.09.2019Properly installing the dimple membrane, base sealing, drainage?15
15.04.2019Missing sealing in bathrooms detected after 16 years.13
06.05.2019What type of shower enclosure is sensible?10
12.07.2023Sealing of floor-to-ceiling windows from the outside74
11.02.2020Withdrawal from the work contract (The shell construction simply does not start)33
23.03.2020Curfew: Am I still allowed to go to the construction site in Bavaria?73
09.04.2020Visit the construction site for ventilation?17
15.05.2021Sealing garden wall to neighbor10
22.06.2021Shower has become too narrow - Custom-made shower enclosure19
19.08.2021House building - an eternal construction site?33
21.09.2022Camera / mobile phone for documentation in the workshop or construction site13

Oben