Today I performed some heavier work again. Prepared seven foundations (formwork) for balconies and exterior stairs according to the metalworker's specifications.![]()
and at the same time partially connected the drainage of the BP. Unfortunately, despite using the mini excavator, did not find one connection point :mad:. By the way, the cisterns were already about 1/3 filled.
Just look in the shaft next door to see which direction the inflow is. Or is that the wrong shaft?