I think it looks better in white when it is in a niche like that. If the tub were freestanding on two or three sides, I would also clad it with the floor tile, but as it is, I find it quite harmonious.
I think it looks better in white when it’s in such a niche. If the tub were freestanding on two or three sides, I would also cover it with the floor tiles, but I find it quite fitting like this.
We will see when the floor is in. The plumbing also wanted to lay the controlled residential ventilation pipes totally stupidly under the ceiling. I said that’s not possible. The reason was the basement is too low (2.38m) and the technical room with 11 sqm is too small. We had to remount other things. Otherwise I would not have accepted it. Last week was somehow pretty awful. Ah, and the electrician registered the network connection by e-mail and didn’t see that the mail hadn’t gone out. Yay... not. - Kitchen will be installed on 17.06. - Blower door test is on 03.07.
You can basically forget about it given the current state of construction...
Explain please, I didn't understand the comment? - The front door will be installed in mid-June - The fireplace insert will be installed in 1-2 weeks - The controlled residential ventilation will go into operation next week So what is the showstopper if we are already moving in on 14.07.?
Explain, I didn't understand the comment? - The front door will be installed in mid-June - The fireplace insert will be installed in 1-2 weeks - The controlled residential ventilation will go into operation next week So what is the showstopper if the move-in is already on 14.07.?
It's hard to change something, for example a window that is not completely sealed, because everything is installed and finished. You will undercut the 1.5 and that is enough.