pffreestyler
2018-12-06 13:31:19
- #1
Rather not the brick cladding, but the jointing – the companies here have no interest in that and pass it on.
Regarding the time: observe the craftsmen when the boss is not around and when he is. Speed difference like in town and on the highway. It would be really stupid to work at the same pace without supervision as with supervision, then the boss would know how fast it could be done and you would always have to speed up. So far, it has also been 6 weeks with a small break for 180 sqm with two people. They should be done in two days then. Gables just take a long time, there is a lot to cut. Even the triangular window held up for almost a whole day.
And I don’t want to miss shutters, I grew up with them and now after 3.5 years without them it is extremely noticeable that they are missing. For me, they are a luxury equivalent to a controlled residential ventilation system.
Regarding the time: observe the craftsmen when the boss is not around and when he is. Speed difference like in town and on the highway. It would be really stupid to work at the same pace without supervision as with supervision, then the boss would know how fast it could be done and you would always have to speed up. So far, it has also been 6 weeks with a small break for 180 sqm with two people. They should be done in two days then. Gables just take a long time, there is a lot to cut. Even the triangular window held up for almost a whole day.
And I don’t want to miss shutters, I grew up with them and now after 3.5 years without them it is extremely noticeable that they are missing. For me, they are a luxury equivalent to a controlled residential ventilation system.