I'll give it a try, it should all basically fit:
Shell construction including interior and exterior plaster, earthworks, development auxiliary work and a few minor things - 161k
Development - 7.5k
Carport including foundation work - 21k
Roof work (flat roof warm roof) - 16k
Shed roof + tinsmith work - 8.3k
Windows (19) + doors - 17k (plastic, basalt gray outside with RC2N on the ground floor as well as on the upper floor at accessible points including window contacts for KNX)
Venetian blinds 6 pieces (mixed sizes) - 4.2k
Roller shutters (13 pieces, aluminum) - 4.6k
Aluminum front door with side panel - 4.5k
Heating (gas without solar), sanitary rough installation, central ventilation with heat recovery and enthalpy exchanger (Zehnder Q350) - 44k (including underfloor heating insulation)
Sanitary items (self-performed) - approx. 7k
Screed - 3.3k
Electrical (relatively extensive KNX with SAT and LAN ~44k (This got pretty out of hand, after an initial 30k :/ )
2x air conditioning 5k
Painting work (exterior + interior) - 11k
Carpenter interior doors + wooden staircase (oak parquet) - 8.4k
Drywall - 2k (boxing kitchen, shed roof ceiling + 1 drywall wall)
Glazier - 4.5k (glass railing 4m wide, glass window sills, shower wall and 2 large mirrors)
Floor tiles (throughout the whole house) - 5.7k
Wall tiles - 1k
Floor covering roof terrace - 1.5k (installation included in flat roof work)
Tiler - 18k (including lots of extra work (also took over smaller parts of painting and plastering))
Outdoor facilities (no invoice yet) ~ 23k
Carport roof sealing (not yet done ~3k
Architect fee - 28k
Totals 453.5k€
That fits pretty much exactly, since that's how it looks on the bank account now.
There was also some small stuff like notary, etc. for the property transfer, which came from the parents.
Kitchen cost 21k, walk-in closet 3.5k, wardrobe 1k.
So by now it should be around ~480k. Really crazy.