House Pictures Chat Corner - Show off your house pictures!

  • Erstellt am 2015-11-25 10:27:31

Eldea

2018-04-28 14:40:16
  • #1
We also have that in the basement. That is a [Schweißbahn], simply a type of vapor barrier for sealing.
 

berndn

2018-04-28 18:04:48
  • #2
Also this week, progress continued briskly. The exterior walls of the main building were completed



and the interior walls were fully constructed. Here is an interim status after the shower enclosure was built.

Originally, a room-height partition was planned, as according to our former architect this could not be implemented otherwise. On Thursday morning, I briefly visited the construction site. To my surprise, I was then asked how high we wanted the shower partition to be, since no height dimension was specified in the plans. So, on short notice, we still got our desired shower partition.


Thanks to the concrete stairs, we do not need a construction staircase. Here is the second-to-last concrete piece toward the upper floor. The last piece will be installed once the filigree ceiling for the upper floor is in place.


So far, we can truly say that we are more than satisfied with our structural builder. Always friendly, helpful, patiently answering our layman questions, and what I find very important, they think along and also bring improvement suggestions.

Actually, the excavator had been announced for the week before last to fill the working areas. It ultimately took until Thursday for the working area to be filled:







Next week, work can now begin on the foundation slab for the extension. However, next week will be a very short week, as construction will pause on Monday due to the holiday.
 

R.Hotzenplotz

2018-04-28 18:09:17
  • #3
Your construction site looks very clean! Nice.
 

11ant

2018-04-28 18:27:42
  • #4
Ah, the main building. Is there also a pool house?
 

berndn

2018-04-28 19:31:16
  • #5


No. But there is a single-story, non-basement extension [emoji846]
 

berndn

2018-04-28 19:37:31
  • #6


yep. We think so too. Both inside the building and around outside, everything is always very neatly tidied up. Today we actually wanted to remove the excess expanding foam in the basement. To our surprise, the rough builder already took care of that yesterday.

As already mentioned, we are really very satisfied with the rough builder so far.
 

Similar topics
10.07.2018Does the structural builder have to paint the transition between styrofoam and brick wall black?12
15.10.2018Is the shell construction overloaded? Current situation in the construction industry!13
08.11.2018Structural shell / Structural shell cost calculation - How does it calculate?52
11.02.2020Withdrawal from the work contract (The shell construction simply does not start)33

Oben