matte
2017-04-24 16:29:32
- #1
After only the construction power was installed in the week before Easter, things really got underway last week.
The first stage is completed, the lower floor slab was poured today.
Next, the distance wall to the upper floor slab will be poured and the upper floor slab prepared.
I could imagine that they might even finish that this week, then masonry work can start as early as next week.

The first stage is completed, the lower floor slab was poured today.
Next, the distance wall to the upper floor slab will be poured and the upper floor slab prepared.
I could imagine that they might even finish that this week, then masonry work can start as early as next week.