matte
2017-12-04 10:12:43
- #1
Envy (because you’re already so far along ) and respect, because you’re doing so much yourself. When did the excavator arrive and when are you moving in?
I just checked the pictures: The excavator started on April 3rd. So, basically a little more than 8 months from start to move-in. Due to individual contracts and split-level (more complex earthworks), it all took a bit longer than on a flat lot (without a basement) and planning with a general contractor. From a coordination perspective, some things could have been done much faster, which always bothered me. But never mind.
So your living room with the balcony above it is spectacular. Is there a floor plan online for that?
Thanks. Check here:
Meanwhile, we have rotated the living room furniture, now the couch is basically on the right wall in the plan. The architect had already suggested this in the planning, but my wife actually didn’t want it. When we first stood in the shell, we quickly changed our minds, just in time to at least lay part of the cables for TV + speakers through the ceiling.
Also, we planned the entrance airlock (due to drafts from the open staircase) and in front of the guest WC (soundproofing, so to speak ) as optional glass walls, but they won’t be implemented for now.