After a long time, here is also a picture of me.
We now have Braas clay tiles in anthracite on the roof, the verge boards, gutters, and pipes are made of zinc, also in anthracite.
Inside, the plumber is working, and the electrician will be able to start soon. The windows will still not arrive until mid-November, which is why we sealed the ground floor with OSB boards and the upper floor with foil.
We want to get the electrical system, underfloor heating, screed, and interior plaster done before Christmas, then we will let everything dry for a while.
