Fuchur
2019-10-03 15:13:56
- #1
After a long and rocky road, things are finally moving forward for us and the excavator is rolling. That’s why I want to let you be a part of it, even though we hadn’t published the new plan here anymore. If anyone can still remember our old thread: We are now in litigation with the architectural firm. Nevertheless, we are happy that we were able to make a fresh start and not remain stuck with a ruin.
The plot is about 1200m² in size and, except for the construction pit and the setback area to the road, almost entirely covered with excavated soil. Absolutely crazy how much loosened earth there is. I hope we can use a significant amount of it for filling and on the property, otherwise it will get expensive.

The plot is about 1200m² in size and, except for the construction pit and the setback area to the road, almost entirely covered with excavated soil. Absolutely crazy how much loosened earth there is. I hope we can use a significant amount of it for filling and on the property, otherwise it will get expensive.