gmt94
2019-02-06 21:36:18
- #1
I would ask the electrician not to run the cables across the door opening (picture 3). The installation zones require a distance of 20 cm from the wall and 15 cm from the reveals when laying on the floor for a reason. In theory, the substructure is weakened here, and since joints in the screed are often planned in this area, you might end up with a heavily loaded screed edge piece with a weakened substructure exactly at this spot.
Thanks for the note, I will discuss it with him tomorrow.