We moved in without a sink u
Our only sink at the beginning was also the one in the guest bathroom – and that only because my husband installed it (we simply liked the Ikea sink best – also in terms of price-performance ratio). Otherwise, we would have kept the faucet outside the door...
That was our rescue:
[ATTACH alt="IMG_20190804_131555.jpg" type="full"]37164[/ATTACH]
...decided on these bricks.
Very pretty! What facade color is planned?
Ah:
A quite light beige-orange-brown.
...even though I can’t really imagine anything under that description, and if I do, then rather something very weird *lol*, but I think it will fit. Now it sounds like coffee melange with sea buckthorn juice
Planned completion mid-February
Move-in mid-February
However, pressure from the start and it hasn’t decreased
One shelf in the kitchen didn’t fit
Repair the day after acceptance counts as finished without rework
OVERACHIEVER!!!!
Also, I still wanted to throw something into the pantry-yes-or-no debate.
We have a pantry – no discussion for me.
For those who remember: disguised behind a kitchen cabinet door, you go directly from the kitchen into the pantry:
[ATTACH alt="IMG_20190805_184557 - Kopie.jpg" type="full"]37166[/ATTACH]
And honestly, all the stuff I have stored there, I don’t want to put into drawers and cabinets.
[ATTACH alt="IMG_20190805_184603.jpg" type="full"]37169[/ATTACH]
And the freezer cabinet is also conveniently within reach (and saves me a freezer compartment in the fridge, which would make it bigger again)
Also, our lighting guy was back yesterday. Now we also have our exterior lights on the balcony:
[ATTACH alt="IMG_20190805_184629.jpg" type="full"]37170[/ATTACH][ATTACH alt="IMG_20190805_184647.jpg" type="full"]37171[/ATTACH]
The little dark boxes right and left of the large window. These are up-and-down lights and the angle can be adjusted individually. We would also do that – if there was power on them *grmpf*
Today our electrician is coming again; he’s supposed to just turn on the power everywhere now. If he has safety concerns, then please protect all cables with terminal blocks.
The railing will not stay like this – solar panels will be mounted on the front, and around it our facade cladding. Inside I don’t find the railing that great either, we’ll see what else I come up with.
On the open side, the balcony will be extended to the property boundary and will turn left around the corner into the terrace. But that’s still a plan for the future. As long as the backyard is still a construction site and still needs to be bricked, the balcony stays as it is. We still have to drive construction equipment back there, and it doesn’t make sense to build further now. It was primarily installed now so that we can install the solar panels.
And in the main bathroom we now also have our main light!!!!
[ATTACH alt="IMG-20190805-WA0005 - Kopie.jpg" type="full"]37173[/ATTACH]
And as you can see: it even works! Hip hip hurrayyyyy!
It was a good choice; the light pointing upwards really lights up the roof peak nicely and makes a great light.
This week the electric heater for the bathroom should finally arrive and attached to it will be our towel holders for the shower towels; then we can finally hang them up and don’t have to drape them on the shower partition and bathtub edge anymore
And here’s a picture of my two moved-in kitties in their current main hangout, our bedroom:
[ATTACH alt="IMG_20190805_184802.jpg" type="full"]37172[/ATTACH]
At least not UNDER the bed this time! But yesterday was pretty quiet in the house anyway, only the lighting guy was here in the morning. That was rather relaxing for the two of them.