Holzhäuschen
2022-04-16 08:40:45
- #1
All interior walls are now up with us, even though we still have to put in a few studs ourselves.
But the house is closed, and our site manager has left.
We are insulating the exterior walls ourselves and are also doing the drywall / paneling of the interior walls. We are working hard on that. The electrician wants walls paneled on one side by the end of April.
We already had the preliminary plumbing installation; now they are waiting for all walls to be prepared with the first panel / two planks. Then the underfloor heating will go in.
In the pictures, you can also see a lot of chaos.
And there are pictures too (oh, and my foot was allowed to walk again after 3 weeks!)