Haven't seen anything from Axel's house in a while, right?
True, but the current pictures aren't that impressive either. In the last few days, the basement was waterproofed – coated twice, once with a fabric insert. Then the insulation and drainage boards were glued on. Everything was finished by yesterday noon.
In the afternoon, the following were on the construction site at the same time:
Our architect,
a gentleman from the waterworks,
an employee of the energy supplier (who also cooperates with Telekom),
the installer and heating engineer,
an employee from the drilling company regarding the geothermal drilling.
All of this suggests that meaningful pictures will be available again soon.
Best regards
Axel