andimann
2016-06-10 19:32:59
- #1
Hi sirhc,
Yes, we are building with a basement, I already posted pictures on page 12 of this thread. We were on vacation for almost 14 days and during that time the guys were not lazy:

On Monday the ground floor slab will be placed, which will then be concreted on Tuesday. So we have a one-floor lead...
The weather here was also not as bad as in NRW in the last 2 weeks. However, backfilling together with the sewer work probably also took a week.
Best regards,
Andreas
That's good, then I'm not the only one showing something here.
In the small profile picture it looks like you are also building with a basement. I'm curious about your pictures and where you stand in comparison. Things have been slow with us lately (holidays, bridge days, storm). But last week we made good progress.
Best regards!
Yes, we are building with a basement, I already posted pictures on page 12 of this thread. We were on vacation for almost 14 days and during that time the guys were not lazy:
On Monday the ground floor slab will be placed, which will then be concreted on Tuesday. So we have a one-floor lead...
The weather here was also not as bad as in NRW in the last 2 weeks. However, backfilling together with the sewer work probably also took a week.
Best regards,
Andreas