House Pictures Chat Corner - Show off your house pictures!

  • Erstellt am 2015-11-25 10:27:31

Saruss

2018-02-20 18:32:20
  • #1
@ruppsen with us, the bricklayers (thanks to laser and measurement technology) and plasterers managed to build all rooms with a maximum difference of 1-2mm compared to the planning. I was amazed myself when I measured after the shell construction. Therefore, I wouldn't worry with a few centimeters of buffer.
 

11ant

2018-02-20 19:23:41
  • #2
I would, to put it mildly, "not call that the norm." I find that nice in the bathroom, but otherwise not significant.
 

hemali2003

2018-02-20 20:28:24
  • #3

For us, every wall was also absolutely accurate to 3 mm. We also calculated with a 6-8 cm buffer where it really mattered.
 

77.willo

2018-02-20 20:32:25
  • #4
For us, a maximum deviation of 20mm in the dimensions was stipulated in the contract. It remained below one centimeter everywhere, as long as I measured accurately enough.
 

tomtom79

2018-02-20 22:46:54
  • #5
The vertical slots must be 20cm away from the reveal. Here it looks like 10cm.
 

Matthew03

2018-02-21 11:50:02
  • #6


You want to save that when it’s worth it. In your example: probably not.
Our first offer was €16,700, with own contribution "chasing" saving = €1,500, with own contribution "chasing + pulling cables" saving = €3,000 flat rate.
For us it was worth it and was relatively easy to do.
 

Similar topics
06.02.2015House with 100% own effort41
06.04.2015Our financing with "own contribution"12
14.01.2016Own contribution - what did you do and would you do it again?79
15.05.2015Own contribution: Determination of residual moisture10
09.12.2015Incorrect material delivery for in-house work15
03.12.2015Own effort - What can be sold well at the bank?64
27.01.2016Own contribution - how to present it to the financer?12
22.03.2016Turnkey vs. ready to move in, own contribution17
21.03.2016Own work - floor coverings, painting, tiling, what else?40
01.03.2017Ready to move in - Estimate house costs with own labor18
13.07.2017Which personal contribution is worthwhile in house construction?39
27.06.2018Prefabricated house provider with electrical installation as own work14
23.07.2018Financing project as a single with a lot of own effort22
31.01.2022Possible savings in self-performed structural work37
19.02.2019Which task is worthwhile to do yourself?67
02.07.2019Own contribution in financing a single-family house11
25.02.2020Assessment of construction project with own labor as well as financing27
03.06.2020Construction cost calculation single-family house architect without own work52

Oben