House Pictures Chat Corner - Show off your house pictures!

  • Erstellt am 2015-11-25 10:27:31

LostWolf

2021-04-30 11:55:23
  • #1


My planning also permanently includes a table (and benches) there
(currently 4m wide, minus the insulation,)
I have already measured this once on the plot (the one to the right of the house will be an extension) and also thought 4m is quite little.
 

Obermuh

2021-04-30 12:07:23
  • #2


In principle, it could also be used as a connecting space in winter, but that probably won’t happen. It is an outdoor area with sun protection, so it is cold and wet in winter. Also, constantly opening and closing the heavy lift-and-slide door is more exhausting than simply walking around.
 

hampshire

2021-04-30 12:30:21
  • #3
I am well aware of the disadvantages of an external connection. We have built our boys their own separate living units, but still live as a family. The connection is via a shared south terrace. There are sometimes wet socks :). The advantages far outweigh the disadvantages: the boys can have visitors whenever they want (currently only not because of the pandemic) and we don't have strangers in our area.
 

Strahleman

2021-05-08 07:39:27
  • #4
Now that the plaster is done, we are installing the underfloor heating ourselves. In the evening, you really know what you've done :D The hallway in the basement unfortunately didn’t turn out very well, but since it’s not a living area, it’s not a big deal. So far, all circuits are between 75m and 85m. However, one circuit has to be removed again today because the pipe is kinked in one spot. But practice makes perfect, and we have more than enough pipe in reserve ;)

Even though things didn’t go smoothly at the beginning, we’ve been on a roll the last few weeks: The drainage can now flow directly outside without a lifting station, via gravity flow (saving us almost 10,000 euros), the plaster has excellent quality (ordered Q2, got Q3), and when the screed is laid on Tuesday, we can check that off the list.


 

i_b_n_a_n

2021-05-08 07:47:53
  • #5
Please also remember to protect the pipes in the area of the doors / passages (predetermined breaking points in the screed require a protective casing around the pipe)
 

Strahleman

2021-05-08 07:59:13
  • #6
Yep, we already have the slotted corrugated pipes on site. I wanted to do them all during the last check. I didn't think about the basement, there are still staples to be removed in the door area.
 

Similar topics
05.06.2010Basement made of high perforated bricks or concrete?11
29.01.2014Cost saving/basement/affordable tiles/sealed screed?13
09.06.2015Gas, heat pump, and solar for a single-family house?36
10.08.2015In which season of the year is it best to bring screed into the basement10
19.05.2021Experiences with brine heat pump491
20.02.2016Basement made of watertight concrete - switch problem12
01.02.2017Basement originally partially concrete, now possibly completely brick-built28
27.07.2017Install controlled residential ventilation ducts without a basement?12
08.06.2020Air-to-air heat pump vs air-to-water heat pump vs ring trench collector - differences50
14.04.2020Air/Water Heat Pump Active Cooling15
14.10.2022Air-to-water heat pump sizing in new construction311
04.01.2022Air-water heat pump current consumption and data1439
06.05.2021New building with basement | WU concrete plus ring drainage21
07.06.2021Installation of heat pump/heating - before or after screed16
25.11.2021Roth heat pump single-family house setting / optimization23
31.03.2022Air-Water Heat Pump - Buffer Storage Yes or No?28
17.10.2022Heating screed with device vs. with heat pump: costs?19
25.11.2022Mill underfloor heating or apply new screed?17
14.01.2023Internal heat pump in the basement not possible due to groundwater?37
29.01.2024Basement made of WU concrete or Poroton?17

Oben