I am surprised that you got approval for something like that without signing any waiver.
For us, it was very simple. During the acceptance of the house, OSB boards were screwed on as a railing. Afterwards, we had the railing built by the metalworker. We bought it as a kit and got help with the assembly. This way, the railing builder has no liability for the finished result.
[ATTACH alt="648417C9-0D0E-4C14-8177-35DDCD4E278C.JPG" type="full"]54535[/ATTACH]