RR.Hotzenplotz 2018-04-12 19:00:53#2So, the backfilling is done. Starting tomorrow, the ground floor will finally be built. Attached are a few impressions. The basement ceiling looks worrying in some places.
So, the backfilling is done. Starting tomorrow, the ground floor will finally be built. Attached are a few impressions. The basement ceiling looks worrying in some places.
Ttruce 2018-04-12 19:01:54#3They told me it comes off with shaking. But it certainly also depends somewhat on the type of paving (permeable with extra wide joints). Which manufacturer is the paving from?
They told me it comes off with shaking. But it certainly also depends somewhat on the type of paving (permeable with extra wide joints). Which manufacturer is the paving from?
AArifas 2018-04-12 22:11:46#6Interior walls on the upper floor and electrical work are finished for now. Now we are waiting for the windows and the roof. The latter will arrive on April 25th. The windows should also be around that time
Interior walls on the upper floor and electrical work are finished for now. Now we are waiting for the windows and the roof. The latter will arrive on April 25th. The windows should also be around that time