We made the attic floor accessible with tongue and groove boarding
Insulated the upper floor completely, built the knee wall, installed the vapor barrier, and covered the gable sides with drywall strips (magazine screwdrivers are a great invention)
The plasterers were here, everything smooth as a baby’s bottom, even if it doesn’t quite look like that in the photos of the lime-cement plaster
and the window sills were made
The waterproofing membrane is coming today and the plumber can start next week