It might be better to carry out these works after drying heating. There are examples here of moldy plasterboards during the construction phase ... detailed discussion gladly in a separate thread.
 

sirhc

2016-12-27 18:56:24
  • #2
Today, as already announced, we worked on insulating the attic. One slant is almost done - two panels are still missing.

First, 200mm of mineral wool was cut to size with an electric keyhole saw, then clamped between the rafters, the vapor barrier was connected to the existing membrane at the central purlin and pulled up, and all transitions in the foil and from the foil to the wall were sealed. Then battens were screwed under the rafters and 22mm OSB panels were added underneath.

As you can see from the wiring chaos, the gas boiler, hot water tank, and the main unit of the controlled residential ventilation system will find their place in the attic, which in turn means more space in the basement.

Air exchange can still take place in the slants on the upper floor (plaster and screed are still drying), and by the end of the second week of January, the plumber and electrician want to be ready so that we can turn on the heating.



 

hbf12

2016-12-28 08:01:08
  • #3


How do you get the stuff up there? Do you have a proper staircase or do you make a hole somewhere in the roof?
 

sirhc

2016-12-29 21:03:19
  • #4
The opening for the pull-out ladder is present, but the pull-out ladder itself has not yet been installed. A regular ladder is placed there, and then the items can be taken up.
 

sirhc

2017-01-02 10:10:26
  • #5
The final result from last Thursday looked like this. However, a wall still needs to be installed approximately under the ridge, on which the boiler can be hung. And the ventilation ducts are annoying.


 

ypg

2017-01-02 10:18:00
  • #6

how high is the first? 1.80?
I’m just imagining the plumber working there on the heater...
 

Similar topics
07.10.2016Which heating is recommended for KfW 55?58
25.06.2013Saddle roof/insulation into the ridge or up to/on the intermediate ceiling?10
02.09.2013Which heating system for prefab houses: air source heat pump, geothermal, solar, photovoltaic17
25.07.2014Energy saving regulation without heating10
09.10.2014Insulate attic / OSB boards11
16.05.2015Linoleum kitchen floor, click panels or roll goods16
12.01.2016Attic OSB boards measuring device15
05.05.2016Insulate the roof: flakes, panels or wool17
20.05.2016OSB panels for the attic "required", yet extra charge?33
09.08.2016Paint Gypsum boards directly???11
14.09.2017OSB panels in the pitched roof17
23.06.2018XPS panels basement insulation - no bitumen layer23
05.08.2019Renew roof insulation from 1986?29
02.10.2019Base plate - film against rising moisture15
13.01.2021Can OSB boards be laid as flooring on carpet?10
03.06.2022Drywall on OSB boards, cracks?21
15.11.2022Keep soil away from the house with plates14
21.01.2025Remove prefabricated house walls and ceiling panels for electrical installation15