Did some heavier work again today. Prepared seven foundations (formwork) for balconies and exterior stairs according to the metalworker’s specifications.
and at the same time partially connected the drainage of the BP. Unfortunately, despite using the mini excavator, one connection point was not found :mad:. By the way, the cisterns were already about 1/3 full.