With us, things are steadily moving forward.
The stack of finished components is continuously growing:
And in the basement, the expansion has already begun. The hot water tank is already in the utility room and has also been enclosed:

Unfortunately blurry. Insulation material will still be added (yes, it’s cellulose!). Otherwise, the TK basement is still empty (but that will change too).
The workshop already has lighting and a power strip (the workbench is supposed to go there later):

The homeowner is already considering an early move-in. After all, the toilet in blue and plastic is already there
But his hopes were dashed: until then, it will be the (weather-protected) workshop of the construction crew.
So he has to wait. He would have loved to start right away, making a workbench out of the door cutouts.