Oopalau 2020-01-24 10:22:55#1It is progressing very slowly because the craftsmen seem to be somewhere else every other day. At least the first tiles are laid..
It is progressing very slowly because the craftsmen seem to be somewhere else every other day. At least the first tiles are laid..
Fface26 2020-01-24 10:25:30#2In the small image section, I was just thinking, what kind of spaced-out horizontally lying window/light strip is that... until I realized that the picture is sideways and that's a front door. Nice tiles!
In the small image section, I was just thinking, what kind of spaced-out horizontally lying window/light strip is that... until I realized that the picture is sideways and that's a front door. Nice tiles!
Oopalau 2020-01-24 10:27:59#3I hope the picture fits now. I rotated it once wrongly and then correctly in iOS to enforce the correct orientation. Now it looks right to me.
I hope the picture fits now. I rotated it once wrongly and then correctly in iOS to enforce the correct orientation. Now it looks right to me.
ZZaba12 2020-01-24 11:28:35#4 How many meters is that? It’s in my input plan. I don’t remember anymore. Otherwise, it was already planned for a caravan later.
How many meters is that? It’s in my input plan. I don’t remember anymore. Otherwise, it was already planned for a caravan later.
111ant 2020-01-24 11:35:23#5 : do the beam ends remain blank? : is the hallway width intentionally matching the tile pattern?
ZZaba12 2020-01-24 11:38:07#6 : do the beam ends remain blank? : is the hallway intentionally four tiles wide? It's not finished yet. That means it will be retouched where necessary. Currently, the roof is being installed and the tool shed is being clad.
: do the beam ends remain blank? : is the hallway intentionally four tiles wide? It's not finished yet. That means it will be retouched where necessary. Currently, the roof is being installed and the tool shed is being clad.