House Pictures Chat Corner - Show off your house pictures!

  • Erstellt am 2015-11-25 10:27:31

quisel

2019-04-10 08:45:10
  • #1

Did you lay the electrical cables in the empty conduit?
 

pffreestyler

2019-04-10 08:55:13
  • #2
What kind of screed do you have? o.O We have to wait 3 weeks before we can start heating, and the tiler won’t start earlier than another 3 weeks after that.
 

Lumpi_LE

2019-04-10 10:02:11
  • #3


In the in-situ concrete slab, the power cables definitely belong in an empty conduit...
 

Slava_S

2019-04-10 11:06:37
  • #4
The screed in the floors is Thermorapid 2.0. Walkable after one day and ready for covering after two weeks. In the showers, this was not installed; here the tiler installs his own and can start even earlier on that.
 

quisel

2019-04-10 11:20:33
  • #5
I feel the same way as you! Our architect wanted to just throw the underground cables, which would basically be permissible, straight into the precast concrete slabs. Do you have sheathed cables or single cores running in the conduits? In principle, both would be possible in the conduit. We consider the single cores possibly a bit easier to replace, as they are less stiff, if that should ever be necessary.
 

Egberto

2019-04-10 17:08:40
  • #6
We're finally getting started too. On Monday, the foundation slab will be poured.
 

Similar topics
10.09.2016Empty conduit from the supply room to the attic 50mm - sufficient14
11.04.2021Plan a conduit for Telekom?21
06.06.2020Pull the cable through the conduit20
01.09.2020Which conduit for LAN cable?32
07.05.2024How to seal a conduit with an underground cable?26

Oben