We have now also experienced the first delay at the construction site. The floor insulation was not available, so the construction was at a standstill for two weeks. At the pace of construction, absolutely manageable.
From the outside, the house has been finished for weeks (masonry work started on January 5th). We really like the brickwork, and the pointing is neat. The photovoltaic system has also been installed for a long time, not full black-black modules, but I still like the look.
The cables are only for the ground floor; there is another technical room on the upper floor. The floor is currently covered with numerous cables, pipes, and lines. Entering the construction site is currently difficult.
The tiles were chosen to match the kitchen furniture, ordered, affordable, and will arrive in two weeks.
The tilers and painters also have capacity within the appropriate time window. As good as it sounds, we hope it continues that way :-)