We're making progress too, the electricians were here!
A few cables
[ATTACH alt="IMG_20220514_104818.jpg" type="full"]71928[/ATTACH]
In week 22 our underfloor heating is coming.
That means for us to finish installing the installation level everywhere, insulate the installation level, and close it from below, sometimes with wood, double drywall or double Fermacell.
Here with wood
[ATTACH alt="IMG-20220515-WA0009.jpeg" type="full"]71924[/ATTACH]
[ATTACH alt="IMG_20220515_114939.jpg" type="full"]71925[/ATTACH]
Drywall with hemp-jute insulation
[ATTACH alt="IMG_20220514_172510.jpg" type="full"]71926[/ATTACH]
Fermacell
[ATTACH alt="IMG_20220515_190907.jpg" type="full"]71930[/ATTACH]
We also chose switches and sockets. For all visible ones it will be Busch-Jaeger in futur linear, matte black, for the rest something cheap in white.
[ATTACH alt="IMG_20220512_100743_489.jpg" type="full"]71931[/ATTACH]
We have finally decided and ordered the tiles for the ground floor. Since I love vegan meat substitutes just as much as tiles with a wood look, we also chose exactly those (Number 1 it became).
[ATTACH alt="GridArt_20220512_112856895.jpg" type="full"]71932[/ATTACH]
Upstairs we now want a harder plank floor than pine or spruce. It will probably be ash, like our staircase. The first offer of 92 € / m² (just the wood) made us gasp a bit, but luckily we only have 38 m² of wood upstairs.
And to finish, a photo from the roof window, under which my bed will stand
