What else can one be excited about there?
Hello 11ant,
to the south, the extension for the living room is still missing, on the following picture to the left of the covered entrance, where the Isokörbe can be seen in the basement ceiling as a transition. The extension will have a flat roof, which will be accessible from the 1st floor.
To the east, the extension for the study is still missing. Where the ceiling will rest is marked in the photo by the insulation installed in the east wall. The study has a shell height of 3.5 meters.
Best regards
Axel
