Today I spent the whole day sorting the riser shaft and laying it neatly and as flat as possible in the basement breakthrough. The amount of time this takes is incredible. In hindsight, the shaft should have been much larger. From the upper floor alone, there are over 50 pipes. Plus the installed lighting and empty conduits from the ground floor... quite a lot adds up. I want to have it finished by tomorrow evening.
 

EdStark

2018-12-18 22:16:57
  • #3

Why weren’t the cables laid directly into the concrete ceiling?
 

ivenh0

2018-12-18 22:26:00
  • #4
Everything that comes out of the ceiling was also laid into the concrete ceiling. The rest are room feed lines, bus cables, LAN cables, SAT, empty conduits for weather station, grounding, and photovoltaic.
 

Dr Hix

2018-12-18 23:08:04
  • #5
Have you discussed the bundles with your screed installer? As far as I know, these routes should not exceed a maximum width of 20cm (12cm is even recommended). The distance between 2 such routes should then be 30cm.
 

Lumpi_LE

2018-12-19 08:05:04
  • #6
what comes together there... I already knew why I didn't feel like dealing with KNX...
 