Climbee
2018-11-02 14:30:56
- #1
So, last week I was busy with other things, so I wasn't very active here.
The reason:
(of course we had to take a photo on the construction site)
But otherwise, a lot has happened:
The freezer room is slowly filling up; the system for the heating (solar, photovoltaic, etc.) is almost finished. What’s still missing is the descaling and the big box for the electricity as well as the ventilation system. But I don't have a picture of that.
Then we got a roof; only the counter battens are missing, then finally the roof tiles will be put on:

The carport is almost finished too (except for the cladding and, of course, the paving):

When the sun shines as nicely as it has the last few days, you almost get a sense of space in the living room (and behind the tarpaulin it’s also cozy and warm):

The double casement window in the bathroom already has its frame:

From the outside, it’s really starting to look like a house:

Now we're looking forward to the roof really being finished. It is already watertight, but the counter battens and the tiles are still missing.
Inside, the electrician is already busy working. Hopefully, the interior walls will come soon, then we will do another inspection with our lighting designer to finalize the last lamps/lighting.
By the end of November/beginning of December the windows should also be installed and then there will be a topping-out ceremony.
The reason:
(of course we had to take a photo on the construction site)
But otherwise, a lot has happened:
The freezer room is slowly filling up; the system for the heating (solar, photovoltaic, etc.) is almost finished. What’s still missing is the descaling and the big box for the electricity as well as the ventilation system. But I don't have a picture of that.
Then we got a roof; only the counter battens are missing, then finally the roof tiles will be put on:
The carport is almost finished too (except for the cladding and, of course, the paving):
When the sun shines as nicely as it has the last few days, you almost get a sense of space in the living room (and behind the tarpaulin it’s also cozy and warm):
The double casement window in the bathroom already has its frame:
From the outside, it’s really starting to look like a house:
Now we're looking forward to the roof really being finished. It is already watertight, but the counter battens and the tiles are still missing.
Inside, the electrician is already busy working. Hopefully, the interior walls will come soon, then we will do another inspection with our lighting designer to finalize the last lamps/lighting.
By the end of November/beginning of December the windows should also be installed and then there will be a topping-out ceremony.